|
|
FRONT TIMING CHAIN CASE EM-169 < REMOVAL AND INSTALLATION > [VQ40DE] C D E F G H I J K L M A EM N P O 9. Remove power steering oil pump bracket. Refer to ST-18, "Removal and Installation" 10. Remove generator. Refer to CHG-29, "Removal and Installation - VQ40DE Models" . 11. Remove water bypass hoses and water hose clamp. Installation (Crankshaft driven type)" 13. Remove water hose at oil cooler. 15. Remove right and left intake valve timing control covers. • Loosen bolts in reverse order as shown. • Cut liquid gasket for removal using Tool. CAUTION: • Shaft is internally jointed with camshaft sprocket (INT) center hole. When removing, keep it horizontal until it is completely disconnected. • Do not damage the mating surfaces. 16. Remove collared O-rings from front timing chain case (left and right side). CAUTION: Do not reuse O-rings. 17. Remove A/C compressor bolts and temporarily secure A/C compressor aside. Refer to and Installation for Compressor" . 18. Remove crankshaft pulley as follows: b. Loosen crankshaft pulley bolt so that there is a 10 mm (0.39 in) gap between bolt and crankshaft pulley. CAUTION: Do not remove crankshaft pulley bolt. Keep loosened crankshaft pulley bolt in place to protect the crankshaft pul- ley from dropping. c. Pull crankshaft pulley with both hands to remove it. Tool number : KV10111100 (J-37228) SEM728G PBIC2631E Tool number : KV11105210 (J-44716) PBIC2918E |