|
|
CHG POWER GENERATION VOLTAGE VARIABLE CONTROL SYSTEM OPERATION INSPECTION CHG-11 < DTC/CIRCUIT DIAGNOSIS > C D E F G H I J K L B A O P N POWER GENERATION VOLTAGE VARIABLE CONTROL SYSTEM OPER- Diagnosis Procedure INFOID:0000000009484982 Regarding Wiring Diagram information, refer to CAUTION: When performing this inspection, always use a charged battery that has completed the battery inspec- tion. (When the charging rate of the battery is low, the response speed of the voltage change will become slow. This can cause an incorrect inspection.) 1. CHECK ECM (CONSULT) Perform ECM self-diagnosis with CONSULT. Refer to . Self-diagnostic results content No malfunction detected>> GO TO 2 Malfunction detected>> Check applicable parts, and repair or replace corresponding parts. 2. CHECK OPERATION OF POWER GENERATION VOLTAGE VARIABLE CONTROL SYSTEM 1. Connect CONSULT and start the engine. 2. The selector lever is in “P” or “N” position and all of the electric loads and A/C, etc. are turned OFF. 3. Select “ALTERNATOR DUTY” in “Active Test” of “ENGINE”, and then check the value of “BATTERY VOLT” monitor when DUTY value of “ALTERNATOR DUTY” is set to 40.0 %. 4. Check the value of “BATTERY VOLT” monitor when DUTY value of “ALTERNATOR DUTY” is set to 80.0%. Is the measurement value within specification? YES >> Inspection End. NO >> GO TO 3 3. CHECK IPDM E/R (CONSULT) Perform IPDM E/R self-diagnosis with CONSULT. Refer to . Self-diagnostic results content No malfunction detected>> GO TO 4 Malfunction detected>> Check applicable parts, and repair or replace corresponding parts. 4. CHECK HARNESS BETWEEN GENERATOR AND IPDM E/R “BATTERY VOLT” : 12 - 13.6 V “BATTERY VOLT” : +0.5 V or more against |