|
|
содержание .. 279 280 281 282 ..
CHG-40 < BASIC INSPECTION > [TYPE 2] DIAGNOSIS AND REPAIR WORK FLOW BASIC INSPECTION DIAGNOSIS AND REPAIR WORK FLOW Work Flow INFOID:0000000010957587 DETAILED FLOW 1. CHECK FOR DTC Perform self diagnosis with CONSULT. YES >> Repair as needed. NO >> GO TO 2. 2. PRELIMINARY INSPECTION Perform the preliminary inspection. Refer to CHG-41, "Inspection Procedure" . >> GO TO 3. 3. INSPECTION WITH CHARGE WARNING LAMP (IDLING) Start the engine and run it at idle. Does the charge warning lamp turn OFF? YES >> GO TO 4. NO >> GO TO 5. 4. INSPECTION WITH CHARGE WARNING LAMP (ENGINE AT 2,500 RPM) Increase and maintain the engine speed at 2,500 rpm. YES >> GO TO 5. NO >> INSPECTION END 5. MEASURE “B” TERMINAL VOLTAGE Start engine. With engine running at 2,500 rpm, measure “B” terminal voltage. What voltage does the measurement result show? Less than 13.0 V>>GO TO 6. CHG-44, "MR20DD : Removal and Installation" (MR engine) or CHG-46, "QR25DE : Removal and Installation" 6. “B” TERMINAL CIRCUIT INSPECTION Check “B” terminal circuit. Refer to Is the inspection result normal? YES >> Replace alternator. Refer to CHG-44, "MR20DD : Removal and Installation" (MR engine) or 46, "QR25DE : Removal and Installation" (QR engine). NO >> Repair as needed. |